{"id":21607,"date":"2022-07-06T07:10:20","date_gmt":"2022-07-06T07:10:20","guid":{"rendered":"https:\/\/www.stu.edu.iq\/?p=21607"},"modified":"2022-07-25T07:12:56","modified_gmt":"2022-07-25T07:12:56","slug":"the-department-of-construction-and-projects-at-the-southern-technical-university-implements-a-number-of-projects-and-is-working-on-planning-for-another-number","status":"publish","type":"post","link":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/","title":{"rendered":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number"},"content":{"rendered":"<p><b>The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number<\/b><\/p>\n<p><b>The Department of Construction and Projects, under the direction of the President of the Southern Technical University, has implemented a number of projects, including building an expansion of the Finance and Administration Department, and is working on planning for another\u00a0 number of projects.<\/b><\/p>\n<p><b>The director of the department, Dr. Abdul Amir Qasim Hassan, indicated that the Department of Construction and Projects has entered the final stages of the building of the financial and administrative annex, which was designed by the architect in the department, Kholoud Abdul Amir Oraibi, and supervised by Engineer Balsam Majid Hamid and Engineer Tahseen Ali Mahdi.<\/b><\/p>\n<p>&nbsp;<\/p>\n<p><b>Pointing out that there are promising projects that are being implemented, including a building for classrooms in the Technical Administrative College of Basra with an area of \u200b\u200b556 square meters, in addition to the establishment of a health complex in Shatrah Technical College with an area of \u200b\u200b30 square meters.<\/b><\/p>\n<p><b>As well as\u00a0 the establishment of a student affairs building within the Maysan Technical College with an area of \u200b\u200b217 square meters.<\/b><\/p>\n<p><b>The director of the department confirmed that the Department of Construction and Projects at the university has many promising future plans that will be implemented as soon as the budget is available, and include the university structure, laboratories and training workshops.<\/b><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-21466\" src=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-225x300.jpeg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-225x300.jpeg 225w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg 480w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-21469\" src=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-1-225x300.jpeg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-1-225x300.jpeg 225w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-1-768x1024.jpeg 768w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-1-700x935.jpeg 700w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-1-600x800.jpeg 600w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM-1.jpeg 960w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-21471\" src=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.34-PM-300x225.jpeg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.34-PM-300x225.jpeg 300w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.34-PM-1024x768.jpeg 1024w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.34-PM-768x576.jpeg 768w, https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.34-PM.jpeg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number The Department of Construction and Projects, under the direction of the President of the Southern Technical University, has implemented a number of projects, including building an expansion of the Finance and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21466,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[119],"tags":[],"class_list":["post-21607","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number - \u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number - \u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629\" \/>\n<meta property=\"og:description\" content=\"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number The Department of Construction and Projects, under the direction of the President of the Southern Technical University, has implemented a number of projects, including building an expansion of the Finance and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\" \/>\n<meta property=\"og:site_name\" content=\"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/stu.edu.iq\/?_rdc=1&amp;_rdr\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-06T07:10:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-25T07:12:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"480\" \/>\n\t<meta property=\"og:image:height\" content=\"640\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#\/schema\/person\/541fe77aa30503e48ea54caebaa248bd\"},\"headline\":\"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number\",\"datePublished\":\"2022-07-06T07:10:20+00:00\",\"dateModified\":\"2022-07-25T07:12:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\"},\"wordCount\":259,\"publisher\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\",\"url\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\",\"name\":\"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number - \u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629\",\"isPartOf\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg\",\"datePublished\":\"2022-07-06T07:10:20+00:00\",\"dateModified\":\"2022-07-25T07:12:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage\",\"url\":\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg\",\"contentUrl\":\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg\",\"width\":480,\"height\":640},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.stu.edu.iq\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#website\",\"url\":\"https:\/\/www.stu.edu.iq\/en\/\",\"name\":\"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.stu.edu.iq\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#organization\",\"name\":\"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629\",\"url\":\"https:\/\/www.stu.edu.iq\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2024\/03\/logo1-1022x1024.png\",\"contentUrl\":\"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2024\/03\/logo1-1022x1024.png\",\"width\":1022,\"height\":1024,\"caption\":\"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629\"},\"image\":{\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/stu.edu.iq\/?_rdc=1&_rdr\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#\/schema\/person\/541fe77aa30503e48ea54caebaa248bd\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.stu.edu.iq\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b610dec1f050176df8a1d124153f4d9d3021d89de8333476a5f847fd8176d430?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b610dec1f050176df8a1d124153f4d9d3021d89de8333476a5f847fd8176d430?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/admin\"],\"url\":\"https:\/\/www.stu.edu.iq\/en\/News\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number - \u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/","og_locale":"en_US","og_type":"article","og_title":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number - \u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629","og_description":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number The Department of Construction and Projects, under the direction of the President of the Southern Technical University, has implemented a number of projects, including building an expansion of the Finance and [&hellip;]","og_url":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/","og_site_name":"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629","article_publisher":"https:\/\/www.facebook.com\/stu.edu.iq\/?_rdc=1&_rdr","article_published_time":"2022-07-06T07:10:20+00:00","article_modified_time":"2022-07-25T07:12:56+00:00","og_image":[{"width":480,"height":640,"url":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#article","isPartOf":{"@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/"},"author":{"name":"admin","@id":"https:\/\/www.stu.edu.iq\/en\/#\/schema\/person\/541fe77aa30503e48ea54caebaa248bd"},"headline":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number","datePublished":"2022-07-06T07:10:20+00:00","dateModified":"2022-07-25T07:12:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/"},"wordCount":259,"publisher":{"@id":"https:\/\/www.stu.edu.iq\/en\/#organization"},"image":{"@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage"},"thumbnailUrl":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/","url":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/","name":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number - \u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629","isPartOf":{"@id":"https:\/\/www.stu.edu.iq\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage"},"image":{"@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage"},"thumbnailUrl":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg","datePublished":"2022-07-06T07:10:20+00:00","dateModified":"2022-07-25T07:12:56+00:00","breadcrumb":{"@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.stu.edu.iq\/en\/News\/21607\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#primaryimage","url":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg","contentUrl":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2022\/07\/WhatsApp-Image-2022-07-06-at-5.43.35-PM.jpeg","width":480,"height":640},{"@type":"BreadcrumbList","@id":"https:\/\/www.stu.edu.iq\/en\/News\/21607\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.stu.edu.iq\/en\/"},{"@type":"ListItem","position":2,"name":"The Department of Construction and Projects at the Southern Technical University implements a number of projects and is working on planning for another number"}]},{"@type":"WebSite","@id":"https:\/\/www.stu.edu.iq\/en\/#website","url":"https:\/\/www.stu.edu.iq\/en\/","name":"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629","description":"","publisher":{"@id":"https:\/\/www.stu.edu.iq\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.stu.edu.iq\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.stu.edu.iq\/en\/#organization","name":"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629","url":"https:\/\/www.stu.edu.iq\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stu.edu.iq\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2024\/03\/logo1-1022x1024.png","contentUrl":"https:\/\/www.stu.edu.iq\/wp-content\/uploads\/2024\/03\/logo1-1022x1024.png","width":1022,"height":1024,"caption":"\u0627\u0644\u062c\u0627\u0645\u0639\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062c\u0646\u0648\u0628\u064a\u0629"},"image":{"@id":"https:\/\/www.stu.edu.iq\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/stu.edu.iq\/?_rdc=1&_rdr"]},{"@type":"Person","@id":"https:\/\/www.stu.edu.iq\/en\/#\/schema\/person\/541fe77aa30503e48ea54caebaa248bd","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stu.edu.iq\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b610dec1f050176df8a1d124153f4d9d3021d89de8333476a5f847fd8176d430?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b610dec1f050176df8a1d124153f4d9d3021d89de8333476a5f847fd8176d430?s=96&d=mm&r=g","caption":"admin"},"sameAs":["http:\/\/admin"],"url":"https:\/\/www.stu.edu.iq\/en\/News\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/posts\/21607","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/comments?post=21607"}],"version-history":[{"count":1,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/posts\/21607\/revisions"}],"predecessor-version":[{"id":21608,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/posts\/21607\/revisions\/21608"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/media\/21466"}],"wp:attachment":[{"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/media?parent=21607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/categories?post=21607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.stu.edu.iq\/en\/wp-json\/wp\/v2\/tags?post=21607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}